|
Category
|
Bulletin Number
|
Bulletin Title
|
| Building Code |
126 |
Patio Cover Post to Footing Connection Requirements (Open in new window) |
| Building Code |
176 |
Grading Plan Processing (Open in new window) |
| Building Code |
181 |
Concrete Placement in Foundations and Floor Slabs (Open in new window) |
| Building Code |
183 |
Removal of Underground Fuel Storage Tanks (Open in new window) |
| Building Code |
185 |
Wall and Fence Requirements (Open in new window) |
| Building Code |
200 |
Four Story Wood-Frame Construction Special Design and Detailing Requirements (Open in new window) |
| Building Code |
203 |
Irvine Ranch Water District Approval on Water Distribution System (Open in new window) |
| Building Code |
204 |
Signage - Post Tension Slab in This Building (Open in new window) |
| Building Code |
206 |
Headroom Clearance of Parking Facilities for Postal Delivery Services (Open in new window) |
| Building Code |
211 |
Piping Installation Plan Submittals (Open in new window) |
| Building Code |
220 |
Soil Report Requirements for Additions (Open in new window) |
| Building Code |
243 |
Elevator Lobby Special Egress-Control System Alternate Materials and Methods CA Building Code - Section 1004.5 (Open in new window) |
| Building Code |
250 |
Roof Slope Requirements (Open in new window) |
| Building Code |
251 |
Structural Observation Requirements (Open in new window) |
| Building Code |
251.1 |
Structural Observation Requirements Program and Report Form (Open in new window) |
| Building Code |
267 |
Requirements for Concrete Exposed to Sulfate-Containing Solutions or Soils (Open in new window) |
| Building Code |
270 |
Steel Frame Fire Block Requirements (Open in new window) |
| Building Code |
283 |
Drop Ceilings in R-3 Occupancies and Individual Units of R-1 Occupancies of Type V Fire-Resistive Construction (Open in new window) |
| Building Code |
284 |
Special Inspection Manual (Open in new window) |
| Building Code |
287 |
Protection of City Storm Drains and Catch Basins during Construction Activities (Open in new window) |
| Building Code |
290 |
Accessibility for Dining, Banquet, and Bar Facilities (Open in new window) |
| Building Code |
294 |
Clinics (Open in new window) |
| Building Code |
295 |
Concrete Slab Footing for Steel Storage Racks (Open in new window) |
| Building Code |
296 |
Domestic Clothes Dryer Moisture Exhaust Duct Length Limitations (Open in new window) |
| Building Code |
299 |
Roof Drainage System Sizing (Open in new window) |
| Building Code |
306 |
Proto II Wall Approval Conditions (Open in new window) |
| Building Code |
309 |
System 800 MHz Countywide Coordinated Communication (Open in new window) |
| Building Code |
311 |
Requirements for Fabrication Approval (Open in new window) |
| Building Code |
316 |
Drafts Stop Requirements in Attics for Group R1 and R2 Occupancies (Open in new window) |
| Building Code |
317 |
Non-Structural Concrete Floor Slab Repair Requirements (Open in new window) |
| Building Code |
323 |
Fire Resistance Rating and Protection Requirements (Open in new window) |
| Building Code |
324 |
Installation of Lathing for Exterior Portland Cement-Based Plaster (Stucco) for Residential Buildings (Open in new window) |
| Building Code |
326 |
Early Release of Gas Meters (Open in new window) |
| Electrical |
109 |
Plan Submittal, Installation and Inspection of Electric Signs and Outdoor Lighting (Open in new window) |
| Electrical |
131 |
Lighting Permit Standards (Open in new window) |
| Electrical |
195 |
Electrical Product Approval (Open in new window) |
| Electrical |
291 |
Illumination Requirements for Commercial Building Address Numerals (Open in new window) |
| Energy |
310 |
Requirements for Split System Air Conditioner Replacements (Open in new window) |
| Grading / Right of Way / Utilities |
145 |
Curb, Gutter and Sidewalk Repair (Open in new window) |
| Grading / Right of Way / Utilities |
147 |
Certification and Transfer of Responsibility Requirements for Grading, Civil and Landscape Design Professionals and Contractors (Open in new window) |
| Grading / Right of Way / Utilities |
151 |
Asphalt Concrete Inspection (Open in new window) |
| Grading / Right of Way / Utilities |
168 |
Haul Routes for Grading Projects (Open in new window) |
| Grading / Right of Way / Utilities |
215 |
Utility Plan Requirements for Precise Grading Plan Submittals (Open in new window) |
| Grading / Right of Way / Utilities |
314 |
Encroachment Permit Requirements for Construction Cranes (Open in new window) |
| Grading / Right of Way / Utilities |
315 |
Encroachment Permit Requirements for Barriers and Covered Walkways (Open in new window) |
| Homeowners |
182 |
Swimming Pool and Spa Plan Submittals (Open in new window) |
| Homeowners |
217 |
Swimming Pool and Spa Removal / Demolition (Open in new window) |
| Homeowners |
257 |
New Roof Covering Adjoining Existing Roofing (Open in new window) |
| Homeowners |
302 |
Survey Requirements to Establish Required Property Line Setbacks (Open in new window) |
| Inspections |
114 |
Required Inspections (Open in new window) |
| Inspections |
266 |
Special Inspections for Inspections Prior to Permit Issuance (Open in new window) |
| Inspections |
272 |
Electric Meter Releases for Residential Dwellings (Open in new window) |
| Inspections |
278 |
Special Inspection Program Requirements (Open in new window) |
| Inspections |
281 |
Concurrent Shell Building and Tenant Improvement Construction and Inspection (Open in new window) |
| Inspections |
312 |
Plan Review and Inspection Requirements for Clearance to Combustibles for Solid Fuel Burning Equipment (Open in new window) |
| Inspections |
324 |
Installation of Lathing for Exterior Portland Cement-Based Plaster (Stucco) for Residential Buildings (Open in new window) |
| Landscaping |
111 |
Landscape Acceptance Procedures for Projects Subject to City Landscaping Inspections (Open in new window) |
| Landscaping |
173 |
Leaf Blowers (Open in new window) |
| Landscaping |
255 |
Tree Removal (Open in new window) |
| Miscellaneous |
260 |
Restriction on Vehicular Traffic Associated With Home Occupation Businesses (Open in new window) |
| Miscellaneous |
273 |
Lot Drainage Guidelines (Open in new window) |
| Miscellaneous |
285 |
Red Imported Fire Ant Quarantine (Open in new window) |
| Miscellaneous |
292 |
Fuel Modification Plan and Program Requirements (Open in new window) |
| Miscellaneous |
307 |
Valuation Threshold for Determining “Unreasonable Hardship” for Alterations, Structural Repairs, or Additions (Open in new window) |
| Miscellaneous |
328 |
Construction Certificate Management Procedures |
| Permit Processing |
209 |
Wet Signature Requirements on Plans (Open in new window) |
| Permit Processing |
253 |
Building Construction Not Requiring a Grading Permit (Open in new window) |
| Permit Processing |
221 |
Requirements for Permit Issuance (Open in new window) |
| Permit Processing |
222 |
Permits and Construction for Repairs and Remodels to Existing Condominiums, Townhouses and Detached Single Family Homes (Open in new window) |
| Permit Processing |
241 |
Requirements for Building Permit for Underground Tank (Open in new window) |
| Permit Processing |
246 |
Workers Compensation Requirements for Permit Issuance (Open in new window) |
| Permit Processing |
254 |
Disabled Access Plan Submittals (Open in new window) |
| Permit Processing |
276 |
Rules for Revisions to Approved Building Plans (Open in new window) |
| Permit Processing |
279 |
Plan Review Turnaround Times (Open in new window) |
| Permit Processing |
318 |
Permit Requirements for Mobile Homes (Open in new window) |
| Permit Processing |
319 |
Fees to Divide a Plan Check or Change the Scope of Work (Open in new window) |
| Plumbing / Sewer / Mechanical |
128 |
Drains & P-Traps for Spas (Open in new window) |
| Plumbing / Sewer / Mechanical |
136 |
Testing Laboratories (Gas Appliances) (Open in new window) |
| Plumbing / Sewer / Mechanical |
180 |
Reclaimed Water (Open in new window) |
| Plumbing / Sewer / Mechanical |
303 |
ABS Piping Material (Open in new window) |
| Plumbing / Sewer / Mechanical |
313 |
Clearance Requirements for Commercial Appliances (Open in new window) |
| Plumbing / Sewer / Mechanical |
321 |
(Open in new window)Water Conserving Plumbing Fixture Verification / Retrofit |
| Plumbing / Sewer / Mechanical |
322 |
Pressure Release Valves in Lieu of Expansion Tanks (Open in new window) |
| Plumbing / Sewer / Mechanical |
325 |
Mechanical Vent and Exhaust Terminations Prohibition at Zero Lot Lines, Yard /Easements and Exclusive Common Elements |
| Plumbing / Sewer / Mechanical |
327 |
Plumbing Fixture Clearance Requirements (Open in new window) |
| Zoning & Code Enforcement |
172 |
Political Signs (Open in new window) |
| Zoning & Code Enforcement |
185 |
Wall and Fence Requirements (Open in new window) |
| Zoning & Code Enforcement |
187 |
Pool Fences (Open in new window) |