Bulletin Number

Bulletin Title

303

ABS Piping Material (Open in new window)

290

Accessibility for Dining, Banquet, and Bar Facilities 

248

Allowable Use of Plastic Drainage Pipe Within Buildings (Open in new window)

151

Asphalt Concrete Inspection (Open in new window)

253

Building Construction Not Requiring a Grading Permit

147

Certification and Transfer of Responsibility Requirements for Grading, Civil and Landscape Design Professionals and Contractors (Open in new window)

313

Clearance Requirements for Commercial Appliances (Open in new window)

294

Clinics (Open in new window)

181

Concrete Placement in Foundations and Floor Slabs (Open in new window)

295

Concrete Slab Footing for Steel Storage Racks (Open in new window)

281

Concurrent Shell Building and Tenant Improvement Construction and Inspection (Open in new window)

328 Construction Certificate Management Procedures 

145

Curb, Gutter and Sidewalk Repair (Open in new window)

254

Disabled Access Plan Submittals (Open in new window)

296

Domestic Clothes Dryer Moisture Exhaust Duct Length Limitations (Open in new window)

316

Drafts Stop Requirements in Attics for Group R1 and R2 Occupancies (Open in new window)

128

Drains & P-Traps for Spas (Open in new window)

283

Drop Ceilings in R-3 Occupancies and Individual Units of R-1 Occupancies of Type V Fire-Resistive Construction (Open in new window)

326 Early Release of Gas Meters (Open in new window)

272

Electric Meter Releases for Residential Dwellings (Open in new window)

195

Electrical Product Approval (Open in new window)

243

Elevator Lobby Special Egress-Control System Alternate Materials and Methods CA Building Code - Section 1004.5 (Open in new window)

315

Encroachment Permit Requirements for Barriers and Covered Walkways (Open in new window)

314

Encroachment Permit Requirements for Construction Cranes  (Open in new window)

319

Fees to Divide a Plan Check or Change the Scope of Work

323

Fire Resistance Rating and Protection Requirements

200

Four Story Wood-Frame Construction Special Design and Detailing Requirements (Open in new window)

292

Fuel Modification Plan and Program Requirements (Open in new window)

176

Grading Plan Processing (Open in new window)

168

Haul Routes for Grading Projects

206

Headroom Clearance of Parking Facilities for Postal Delivery Services (Open in new window)

324 Installation of Lathing for Exterior Portland Cement-Based Plaster (Stucco) for Residential Buildings

291

Illumination Requirements for Commercial Building Address Numerals

203

Irvine Ranch Water District Approval on Water Distribution System (Open in new window)

111

Landscape Acceptance Procedures for Projects Subject to City Landscaping Inspections (Open in new window)

173

Leaf Blowers (Open in new window)

131

Lighting Permit Standards

273

Lot Drainage Guidelines  (Open in new window)

325 Mechanical Vent and Exhaust Terminations Prohibition at Zero Lot Lines, Yard Easements and Exclusive Common Elements

257

New Roof Covering Adjoining Existing Roofing (Open in new window)

317

Non-Structural Concrete Floor Slab Repair Requirements (Open in new window)

126

Patio Cover Post to Footing Connection Requirements (Open in new window)

318

Permit Requirements for Mobile Homes

222

Permits and Construction for Repairs and Remodels to Existing Condominiums, Townhouses and Detached Single Family Homes (Open in new window)

211

Piping Installation Plan Submittals (Open in new window)

312

Plan Review and Inspection Requirements for Clearance to Combustibles for Solid Fuel Burning Equipment  (Open in new window)

279

Plan Review Turnaround Times (Open in new window)

109

Plan Submittal, Installation and Inspection of Electric Signs and Outdoor Lighting

327 Plumbing Fixture Clearance Requirements (Open in new window)

172

Political Signs (Open in new window)

187

Pool Fences (Open in new window)

322

Pressure Relief Valves in Lieu of Expansion Tanks

287

Protection of City Storm Drains and Catch Basins during Construction Activities (Open in new window)

306

Proto II Wall Approval Conditions  (Open in new window)

180

Reclaimed Water

285

Red Imported Fire Ant Quarantine (Open in new window)

183

Removal of Underground Fuel Storage Tanks (Open in new window)

241

Requirements for Building Permit for Underground Tank Installation

267

Requirements for Concrete Exposed to Sulfate-Containing Solutions or Soils (Open in new window)

311

Requirements for Fabrication Approval

221

Requirements for Permit Issuance (Open in new window)

310

Requirements for Split System Air Conditioner Replacements

167

Residential Plan Check (Open in new window)

260

Restriction on Vehicular Traffic Associated With Home Occupation Businesses  (Open in new window)

299

Roof Drainage System Sizing

250

Roof Slope Requirements (Open in new window)

276

Rules for Revisions to Approved Building Plans (Open in new window)

204

Signage - Post Tension Slab in This Building (Open in new window)

220

Soil Report Requirements for Additions

284

Special Inspection Manual (Open in new window)

278

Special Inspection Program Requirements (Open in new window)

266

Special Inspections for Inspections Prior to Permit Issuance (Open in new window)

270

Steel Frame Fire Block Requirements (Open in new window)

251

Structural Observation Requirements (Open in new window) 

251.1

Structural Observation Requirements Program and Report Form

302

Survey Requirements to Establish Required Property Line Setbacks (Open in new window)

182

Swimming Pool and Spa Plan Submittals (Open in new window)

217

Swimming Pool and Spa Removal / Demolition  (Open in new window)

309

System 800 MHz Countywide Coordinated Communication (Open in new window)

136

Testing Laboratories (Gas Appliances) (Open in new window)

255

Tree Removal (Open in new window)

215

Utility Plan Requirements for Precise Grading Plan Submittals (Open in new window)

307

Valuation Threshold for Determining “Unreasonable Hardship” for Alterations, Structural Repairs, or Additions  (Open in new window)

185

Wall and Fence Requirements (Open in new window)

321

Water Conserving Plumbing Fixture Verification / Retrofit

209

Wet Signature Requirements on Plans (Open in new window)

246

Workers Compensation Requirements for Permit Issuance